TERRA.WIRE
Search continues for survivors of deadly flash flood in India
SHIMLA, India (AFP) Jul 18, 2003
A search continued Friday for bodies and survivors from a flash flood which swept away a labourer's construction camp in a remote Himalayan valley, killing 100 people.

Hundreds of rescue workers used heavy earth-moving machinery to lift boulders and debris at the disaster site in Himachal Pradesh state's Kulu valley where Wednesday's flash flood roared through a hydro-power project workers' camp.

"A machine with a large excavator and shovel started clearing the debris and huge boulders this morning (Friday). Our rescue operations are still being hampered by rain," said R.D. Nazeem, the deputy commissioner of Kulu.

"Except for a severed arm of a labour woman, no more bodies have been unearthed so far (during the rescue operation)," he added.

Police said 19 bodies had been recovered after the disaster, but they said it was feared 40 people could have died. Rescue workers have put the death toll much higher at around 100.

Around 200 migrant workers from Nepal and the Indian states of Bihar and Kashmir were asleep in their shanty homes when the skies opened up.

A report in the local media said 30 children were missing after the accident, but authorities refused to confirm this to AFP.

While refusing to comment on the report, state legislator Khemi Ram pointed a finger at local labour contracters.

"You see the trouble is that these labour contractors are not revealing the details of how many people they had actually employed at the site to avoid paying compensation. Confusion prevails because government agencies do not have any records," said Ram.

"The toll is likely to be between 150 and 200. A lot of bodies could still be buried in the debris or washed away downstream by the Parvati river."

"The force of a flash flood like this is so severe that even limbs get torn off by the water current. I doubt we will find bodies intact," warned an officer heading the rescue operations from India's paramilitary Indo-Tibet Border Police (ITBP).

Meanwhile, the state government released five million rupeesdollars) for the relief and rescue operation.

State Chief Minister Virbhadra Singh visited 40 injured workers in hospital in Kulu.

Engineers at the Parvati hydropower facility said it had suffered a major setback.

"Some damage has been done to the head race tunnel of the 2,051 megawatt Parvati Power Project," said M.M. Madan, general manager of the National Hydel Power Corporation.

"It will take several days before the approach roads to the power project site are repaired. This will naturally delay the construction of the project and is a major setback."

The hydroelectric project is one of the largest in Asia. With four tributaries of the Indus River flowing through hilly province of Himachal Pradesh the state boasts a fifth of India's hydro-power potential.

The Meterological Department in New Delhi said it could not rule out another cloudburst like Wednesday's killer deluge.

TERRA.WIRE