Earth News from TerraDaily.com
Japan nuclear plant operator may have underestimated quake risks
Tokyo, Jan 6 (AFP) Jan 06, 2026
A Japanese nuclear plant operator said it may have presented data underestimating earthquake risks to regulators, as Japan moves to revive nuclear power nearly 15 years after the Fukushima disaster.

Chubu Electric Power's Hamaoka plant -- located in an area of central Japan at risk of a potential "megaquake" -- is undergoing regulatory safety checks, with the aim of restarting two reactors.

But the company's president said late Monday that the estimated maximum seismic ground motion that the plant could experience during a quake "may have been underestimated".

"This incident could seriously affect the (safety) review process and undermine the trust of local communities and other stakeholders in our nuclear business, and potentially shake its very foundation," he told reporters during an emergency press conference.

Japan pulled the plug on nuclear power after a colossal earthquake and tsunami sent three reactors at the Fukushima atomic plant into meltdown in 2011.

However, the resource-poor nation now wants to revive atomic energy to reduce its heavy dependence on fossil fuels, achieve carbon neutrality by 2050 and meet growing energy needs from artificial intelligence.

The world's biggest nuclear plant, Kashiwazaki-Kariwa, is expected to restart operations later this month, pending final approval from the Nuclear Regulation Authority (NRA).

The estimate of maximum seismic ground motion is important for the earthquake-resistant design of nuclear plants.

In September 2023 the NRA approved Chubu Electric's estimate of 1,200 gal, a unit of acceleration used to measure the intensity of quakes.

But in February last year the NRA received information from a whistleblower that the utility "may have used data different from what was presented" to the nuclear watchdog, NRA official Keiichi Watanabe told AFP on Tuesday.

Since then, the watchdog has been conducting its own probe, he said.

The NRA suspended its safety review process for the Hamaoka plant in late December, and the issue "will be discussed in meetings open to the public", the first of which will be held on Wednesday, he said.

The Hamaoka plant is located in Omaezaki, Shizuoka prefecture, near a seismic fault line where a massive Pacific earthquake is expected to occur in the coming years or decades.

In 2024, the Japan Meteorological Agency issued its first special advisory for a possible "megaquake" in the area, known as the Nankai Trough, before lifting it a week later.

The government has said a quake in the 800-kilometre undersea trench and subsequent tsunami could kill as many as 298,000 people and cause up to $2 trillion in damages.

Chubu Electric said it had set up a panel of lawyers to look into the matter.





Space News from SpaceDaily.com
Superconducting thruster cuts power and mass for space propulsion
Rare lensed supernova offers new route to measure cosmic expansion
Ganymede aurora study links moon and Earth space weather

24/7 Energy News Coverage
AALTO plans Zephyr stratospheric hub in northern Australia and seeks local payload partners
Ancient guano drove Chincha coastal power
UAH lands first DARPA award for biological sciences department

Military Space News, Nuclear Weapons, Missile Defense
Sidekick autonomy software guides YFQ-42A test mission for CCA program
Infleqtion lists shares on NYSE as neutral atom quantum firm
CGI and Vantor team on AI spatial intelligence for GNSS denied operations

24/7 News Coverage
Solar-driven ionosphere charges may nudge stressed faults toward rupture
Stable black carbon in mangrove soils boosts coastal climate role
Low crystallinity iron minerals show promise for chromium cleanup and carbon storage


ADVERTISEMENT



All rights reserved. Copyright Agence France-Presse. Sections of the information displayed on this page (dispatches, photographs, logos) are protected by intellectual property rights owned by Agence France-Presse. As a consequence, you may not copy, reproduce, modify, transmit, publish, display or in any way commercially exploit any of the content of this section without the prior written consent of Agence France-Presse.