Earth News from TerraDaily.com
Ethiopia mega-dam overcame war, funding obstacles
Nairobi, Sept 9 (AFP) Sep 09, 2025
Africa's largest hydroelectric dam, inaugurated in Ethiopia Tuesday, had to overcome financial, logistical and war-related challenges, the Italian construction magnate behind the scheme told AFP.

African leaders joined Ethiopian Prime Minister Abiy Ahmed in officially unveiling the Grand Renaissance Dam (GERD) that has promised to revolutionise the country's energy sector but also caused tensions with neighbouring Egypt.

The dam is the largest by power capacity on the continent and could transform a country where almost half the 130-million population still lacks electricity, according to World Bank data.

"This country that was dark in the evening when I first arrived here... is now selling energy to neighbouring countries," Pietro Salini, CEO of Webuild, the main contractor for the project, told AFP.

Kenya, Tanzania and South Sudan have already agreed deals to buy the electricity.

The dam towers 170 metres (550 feet) high and stretches nearly two kilometres (1.2 miles) across the Blue Nile near the Sudanese border.

The $4-billion megastructure is designed to hold 74 billion cubic metres of water and generate 5,150 megawatts of electricity -- more than double Ethiopia's current capacity.

More than 25,000 people, mostly from Europe and Ethiopia, laboured on the giant site from 2011 to its official opening.

Salini said his firm spent some 250,000 hours training workers in health and safety and technical engineering, noting: "The human factor is always the hardest to tackle."

Neighbouring countries Egypt and Sudan are wrong to worry about the impact of the dam on their water supply, he said.

"The hydroelectric project releases water to produce energy. They are not irrigation schemes that consume water," said Salini.

"There's no change in the flow. It's just regulated," he added.

Salini also said the project was entirely financed by Ethiopia.

"Not one international lender was willing to put money in this project," he told AFP.

A brutal civil war between the government and rebels from the Tigray region between 2020 and 2022, which claimed roughly 600,000 lives, also slowed the GERD'S completion.

But all those challenges are now in the past, Salini said.

"At an opening ceremony, you don't think about past difficulties," he added.





Space News from SpaceDaily.com
Spacecraft study shows interstellar comet encounter mission within reach
Upcoming Launch to Boost NASA's Study of Sun's Influence Across Space
NASA Announces CHAPEA Crew for Year-Long Mars Mission Simulation

24/7 Energy News Coverage
Ethiopia's multi-billion-dollar dam promises economic boost
China's Xi calls on BRICS countries to 'resist all forms of protectionism'
Deep Fission secures $30M to advance underground nuclear reactors

Military Space News, Nuclear Weapons, Missile Defense
Iskander missile used in Russia attack on Kyiv govt building: official
North Korea's Kim oversees ICBM engine test: state media
Trump hails cancelation of award ceremony for Tom Hanks

24/7 News Coverage
Climate change is making rollercoaster harvests the new normal
Global study maps regions most threatened by ocean plastic pollution
Global trade drives one third of rising methane emissions


ADVERTISEMENT



All rights reserved. Copyright Agence France-Presse. Sections of the information displayed on this page (dispatches, photographs, logos) are protected by intellectual property rights owned by Agence France-Presse. As a consequence, you may not copy, reproduce, modify, transmit, publish, display or in any way commercially exploit any of the content of this section without the prior written consent of Agence France-Presse.